Jump to content
View of the sewage sludge incineration plant
Thermische Verwertung Mainz GmbH

Efficiency table

Energy efficiency table

The measures listed in the funding application relate to energy-saving measures that are not required by EU standards or legal regulations but represent environmental measures that go beyond these requirements.

There is no legal requirement for energy generation following sewage sludge incineration.

The basis for the implementation of additional environmental measures was the constructive cooperation between the planner and the client (TVM GmbH). The objective was to select and combine energy-efficient mechanical equipment for sewage sludge incineration available on the market in such a way that its type and arrangement resulted in a particularly energy-optimized overall project.

Energy efficiency table

Explanations and notes

Picture credits

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.