Jump to content
Wirtschaftsbetrieb Mainz (AÖR)
In Mainz! For Mainz! Wirtschaftsbetrieb Mainz!

Path renovation at Bretzenheim cemetery

Second construction phase with parking lot renovation

They are to become more attractive and, above all, safer: the paths at Bretzenheim Cemetery. After the first phase of construction, which included the renovation of the visitor toilets, was successfully completed, the second phase of the project began on October 9, 2023.

The picture shows a plan with the construction site areas

The paths around grave fields 2, 14, 15, 16, 17, 20, and 21 will be paved with concrete paving stones. In addition, the visitor parking lot will be completely renovated. It will be paved with grass pavers and will have to be partially closed for the duration of the work.

The picture shows the cemetery parking lot

However, the construction company will suspend its work during the funeral services and burials so that these can take place as normal.

Explanations and notes

Picture credits

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.