Jump to content
15. July 2026

Lane Closures on Hans-Böckler-Straße and Karl-Zörgiebel-Straße

Starting Monday, July 20, and expected to continue through August 14, 2026, Mainzer Netze will be conducting civil engineering work to disconnect a gas line at Hans-Böckler-Straße 87 / at the corner of Karl-Zörgiebel-Straße in the Mainz-Bretzenheim neighborhood. The sidewalk and one lane of Hans-Böckler-Straße will be closed in this area. Access to Karl-Zörgiebel-Straße will also be completely closed.

Motorized private vehicles and bicyclists on Hans-Böckler-Straße will be routed past the construction site via a mobile traffic light system. Access to Karl-Zörgiebel-Straße is available via the entrance near Sankt Bernhard Church. 

Pedestrians can pass the construction site on one side.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.