Jump to content
04. September 2026

Changes to Traffic Flow in the Holzhofstraße Area

Mainzer Fernwärme’s civil engineering work on Holzhofstraße is now also beginning at the intersection with Windmühlenstraße. Starting Monday, September 7, 2026, the right-turn lane from Windmühlenstraße onto Holzhofstraße will be closed. Private vehicle and bicycle traffic will be rerouted toward Weißliliengasse. The existing one-way traffic regulation in the direction of Rheinstraße will remain in effect. The work is expected to last until October 24, 2026.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.