Jump to content
18. September 2026

Bus Stop Renovation: Complete Closure in Borner Grund

From Monday, September 21, through October 23, 2026 (tentatively), the “Pfarrer-Dorn-Straße” bus stop in Borner Grund, near buildings 64 and 66, will be renovated by the Street Maintenance Department to make it accessible. As a result, this area in the Mainz-Marienborn neighborhood will be completely closed to traffic.

Motorized private vehicles and bicyclists heading toward Lerchenberg or the A63 will be rerouted via Pfarrer-Dorn-Straße and Wiesenstraße. Traffic heading toward Bretzenheim will be rerouted via Am Alten Weg and Zum Knechelsberg. 

Pedestrians may pass through the construction site.

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.