Jump to content

Binger Straße - expansion of the streetcar network

The project

The "Binger Straße" expansion project has created a new tram line connecting Alicenplatz to Münsterplatz. This project thus relieves congestion at the main train station as a public transit hub. In addition, the groundwork has been laid for future expansion projects. As part of the construction work, utility lines and sewer lines were laid, the tram tracks were built, and the asphalt surface was repaved. The stops were also made accessible to improve comfort and accessibility for everyone.

The renovation work is now complete. Since August 8, 2026, Binger Straße has been reopened to vehicle traffic in both directions. 

Explanations and notes

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.