Jump to content
Wirtschaftsbetrieb Mainz (AÖR)
In Mainz! For Mainz! Wirtschaftsbetrieb Mainz!

Test construction of flood protection wall at the customs harbor

As part of the redevelopment of Mainz's customs port, flood protection for the state capital has also been further expanded. If the Rhine reaches a level of 7.40 meters, a mobile wall will protect areas of Neustadt from the floodwaters in the future. A practical test at the beginning of September was to show whether all the elements fit together and the structure works without any problems—and it was a success. Here are a few pictures of the successful "dress rehearsal."

The picture shows how the inlets are prepared
The picture shows how two employees insert the wall beams
The picture shows the fully installed wall
The picture shows the fully installed wall

Press review

Explanations and notes

Picture credits

Sprachauswahl

Quick search

This website was automatically translated using AI

This website was automatically translated by DeepL's AI. It is possible that the machine translations may not fully correspond to the original text. The State Capital of Mainz assumes no liability for the accuracy, completeness, or timeliness of the translations. Furthermore, there is no guarantee that all content on mainz.de will be fully translated —for example, applications integrated as i-frames (such as “Lost and Found Online”), content embedded via interfaces (such as the events calendar), and files (e.g., PDFs, images, graphics) may not be translated. No liability is assumed for damages resulting from missing, incomplete, or incorrect translations.

When accessing the pages, personal data remains anonymous, as no data is transmitted to the service provider. The translated content is stored locally on the web server of the State Capital of Mainz and made available directly from there.